A quick visit this afternoon has revealed that we now have a completed roof (with pointing and capping), as well as a few other things that have either been done, or are in the works:
- Wall insulation & sisalation (blue wrapping) has been completed;
- Doors & windows have been delivered and are in the Garage;
- Timber stacker doors to Alfresco area have been installed;
- Telephone & data points have been run from the meter box;
- Ducting in place for the air-conditioning and the ceiling unit in place.
Now that the wall insulation and sisalation (blue wrapping) has been done, it makes it much easier to gauge the size and layout of each room as you can no longer see straight through the whole frame and the windows and doors all have their place now.
Here's hoping for lots more work to be done before the weekend :)
|