Thursday, 29 August 2013

We have a start date!

After hearing nothing since last Thursday, I decided to call Plantation this morning to find out what was going on with our Site Supervisor. An hour after leaving a message on our Administrator's phone, I received a phone call from her, apologising profusely as our file had been allocated to the wrong Site Supervisor!!! She did, however, tell me that our new & correct Site Supervisor would be calling me within 2 hours to advise of a start date.

True to their word (for once) and only half an hour later, Luke called to introduce himself and give us the good news that our site cut would either be tomorrow (Friday) or Monday at the absolute latest. I then received an SMS this afternoon confirming the site cut would be on Monday!

So at long last, we have some good news that we will start to see something happening. We are going for one last drive out to the block this weekend (photos to follow of course) and I will then be visiting on a regular basis to take photos and keep everyone up to date with our our home is progressing!

Sunday, 25 August 2013

Not long now until the building begins

I finally got a call from Plantation on Thursday afternoon, confirming that our file had been handed over to the Construction Team and that our Site Supervisor had been allocated. Although we have not been given a definitive start date yet, I was told that our Site Supervisor would call me by Tuesday afternoon - and that he would be able to give me a confirmed start date for the earthworks. So another few "impatient" days to wait until we get a start date.

Unfortunately we were held up by our discontinued feature tile to the Bathroom & Powder Room, and combined with the Brisbane Ekka Public Holiday last Wednesday, we were unable to confirm our replacement tile and sign off on the appropriate Post Contract Variation until Monday. This meant our file couldn't be handed over until Wednesday at the earliest. But hopefully the weather stays fine and they can make up some time on the build.

We have been "quoted" 4 months (ie. 16 weeks) and if the build starts in the first week of September (as I expect it won't be this coming week), then it cuts us very fine to a pre-Christmas completion. But we do have an excellent Site Supervisor (or so I have been told) - Travis is the Site Supervisor Plantation use for their display homes......given their display homes look very nice, I am hoping this is a good thing!

Hopefully I will have another update later in the week with a start date.

Friday, 16 August 2013

Slightly amended colour selections

I received an email from our Colour Consultant at Plantation on Tuesday afternoon, informing us that our feature tile we had chosen for the Main Bathroom & Powder Room had been discontinued and we would have to select a replacement. I jumped in the car and drove down to Plantation to have another look through their tile selections, however the selection was pretty dismal so I then headed over to Beaumont Tiles (Plantation's Tile Supplier) to see a wider range.

I managed to find a tile that used the same stone but in a different pattern so had the sales person at Beaumont call up their Head Office to see if they could do it at the same price (even though it was considerably more expensive). Since I was there right on 5pm, they couldn't get through so told me he would call on Thursday.

On Thursday I called back to the Beaumont store as I hadn't heard anything, to be informed that the replacement tile I had chosen had also been discontinued - it hadn't updated on their computer system!

So today, once again, I headed over to Beaumont and selected another feature tile, which has similar colours and also introduces a darker colour into the feature tile, which should complement our cabinetry quite well.

To refresh everyone's memory, I have put up our most recent colour selections below - changes are:

  • New feature tile to the Main Bathroom
  • Different Entrance Door
No word from Plantation yet as to a start date - hopefully it will be very soon!




 

Monday, 12 August 2013

Let there be lights!!

Over the weekend, we paid a visit to Lighting Illusions at Macgregor to finalise our lighting selections. We had previously obtained a quote in May, however needed to refresh memories and put down our deposit. Not much has changed since our original quote - the only exceptions were the ceiling fans which, although they look identical, now have LED lights in them as well :)

In a nutshell, we have gone with:

  • LED Downlights throughout the main living areas
  • 3 Pendant lights over the kitchen island bench
  • Ceiling fans with LED lights in the bedrooms
  • Exhaust/Fan/Heat combos in each bathroom
  • Oyster lights in TV Area, Laundry & Ensuite toilet
  • Oyster light outside the Laundry & under the Porch
  • 2 Up/Down Charcoal LED lights either side of our front porch
  • Slimline Fluro in the Walk-in-Robe and Pantry
  • Basic Fluro in the Garage


I have posted photos below of each of our selections (with the exception of the Up/Down lights at the front as they are a special order item):

Main Bathroom
Ensuite

To each of the 5 bedrooms

Downlights to be used throughout the main living areas


Outside the Laundry and under the Porch

Garage

Pantry & Walk-in-Robe

Kitchen pendant over the island bench

Close up of kitchen pendant

Oyster light to TV Area


Friday, 2 August 2013

Council Approvals, Final Plans & next steps

We are soooooo close now!!!!

On Wednesday, I received word from Plantation that our plans had been approved by Council (including our Build Over Sewer application) and that they would start organising the final plans. Then on Thursday, we received the Final Plans (which were subsequently returned very promptly!!). And today, the Bank signed off on the "Authority to Commence Construction"!!

Everything has happened extremely quickly (including the Council approval which only took 4 weeks, compared to the 7-9 we were quoted) and our file has now progressed on to the Labour & Material Allocation stage before being handed over to our Site Supervisor (we don't know who this is yet....). Needless to say, a lot of this is down to our excellent Pre-Site Administrator and her Manager, who have been pushing our file through as quickly as humanly possible, given the delays and frustrations we experienced at the start.

But what is even more exciting is that we now have an estimated site start date of Monday 19 August!! This is only 2 weeks away, and if the weather stays relatively dry (like it has lately), then there is now a very good chance that we will have handover before Christmas!! This would be ideal since we have already "tentatively" set our flooring date for 20 December and would also give us the opportunity to get other things done before the usual Christmas shut-down period (like appliances installed and driveway done). It also means we could go over and paint our feature walls and put up our window coverings over the Christmas break :)

In terms of what we haven't done yet - the only things left are the light fittings and window coverings.......we went out and got quotes for the light fittings around 2 months ago but never progressed any further than that so this is something we will be finalising in the next couple of weeks to ensure we have everything we need in time for the electrician. As for the window coverings, this is something that we will be doing ourselves so we have a little bit more time to think about this.

On the land side of things, not much has changed there really, except we now have 2 trees planted on our footpath. Whilst they do look nice, obviously the developer couldn't be bothered taking the time to read our plans before planting them to realise that our driveway is going right where the trees are!! So we will have to move them and replant them further down our footpath prior to construction starting - not too much of a hassle, but a small annoyance nonetheless. I have put a couple of photos below for interests sake.

Obviously once the building starts, there will be plenty more photos and posts to keep everyone updated :)