Thursday 23 May 2013

Final look at the block before we head off

I took an afternoon drive out to Woodlands today to take one final look at the block before we head off to the US on Sunday for 4 weeks. Things are continuing to progress nicely, with the topsoil being put on the blocks ready for grading and levelling next week, and the road base is down in preparation for a road next week as well. Although it will be a shame that we won't be here to be able to drive up to our block, it's also exciting knowing that a lot will be happening whilst we are away.

After yesterday's issues with Plantation, things at least appear to be back on track with timelines and information provided. Needless to say we will continue to keep on top of Plantation whilst we are away.

The great news is that our land has been topsoiled and will be graded and levelled off early next week, which means Plantation will be doing our soil test and site survey by the end of next week. Also by the end of next week, we should have a bitumen road out the front and a registered block of land. That also means that our plans should be well and truly into Council by the time we get back.

If we get any information as to how things are progressing whilst we are away, we will update :)

Looking at our block from across the road! The soil at the front is the leftover "topsoil" which they use to level and grade the block - it will disappear shortly

Looking down the road - the roadbase is down and ready for bitumen next week!


No comments:

Post a Comment